Blue Ash New Golf Course Maintenance Facility Design-Build

R.E. Warner provided architectural and engineering services as part of a Design-Build team with Shook Construction for a new maintenance facility for the Blue Ash Golf Course.

R.E. Warner provided architectural and engineering services as part of a Design-Build team with Shook Construction for a new maintenance facility for the Blue Ash Golf Course.

Project Highlights

Cost: $3.5 million

-18,000 SF
-Includes an Insulated Pre-engineered Metal Building (PEMB) structure
-Project had a shortened schedule, with the maintenance wings designed and built out of a metal building system and the office portion traditional build.
-Modern, innovative layout that increases workflow efficiency, decreases noise from maintenance activities, and has space for all of the equipment to be stored indoors.
-Features a wash water recycling system that reuses the same water infinitely.
 

Project Overview

The City of Blue Ash selected R.E. Warner and Shook Construction to provide design-build services for a new Golf Course Maintenance Facility in Blue Ash, Ohio. The project includes demolition, site and construction phasing, site improvements, a new maintenance building, and an Integrated Pest Management building. The project had a shortened schedule, with the maintenance wings designed and built out of a metal building system and the office portion traditional build. 

Demolition involved removing the existing 7,200 s.f. maintenance building, a large greenhouse, and temporary relocation of bulk-material storage bins. Our team coordinated with the owner to minimize the impact on course operations. The contractor also relocated existing maintenance equipment to temporary work areas during construction and provided final relocation to the new building.

The new maintenance building is an approximately 18,000 sf “L” shaped building and includes an insulated Pre-engineered Metal Building (PEMB) structure. The exterior has a more residential aesthetic than industrial. The interior includes offices, break rooms, restrooms, equipment and tool storage, and an equipment maintenance garage. It features a modern, innovative layout that increases workflow efficiency, decreases noise from maintenance activities, and has space for all of the equipment to be stored indoors.

The project also included a new chemical storage building with a covered wash-bay and gasoline pumping station as well as modifications to the existing greenhouse building to accommodate temporary equipment maintenance operations.

The facility also features a wash water recycling system that reuses the same water infinitely.

See photos from the City of Blue Ash here.
Market Director - Commercial & Government

Jen Kalin, RA, NCARB, LEED AP

Contact
E-Mail
440-835-9400

Featured Services
Civil & Site Engineering
Electrical Engineering
Mechanical, HVAC & Piping Engineering
Structural Engineering
Architecture, Planning & Interior Design
Surveying, 3D Laser Scanning & Construction Staking
Construction Services

See More

Get details about our capabilities or see more projects.

Our Services
Portfolio

Join our email newsletter

Back to top
Copyright 2025 R.E. Warner & Associates

Menu

AboutCareers
440-835-9400
440-835-9474
Ohio Office (HQ) 25000 Country Club Blvd., Ste. 340 North Olmsted, OH 44070
440-835-9400
440-835-9474
Alabama Office 1500 1st Avenue N Innovation Depot #99 Birmingham, AL 35203