Installation of a single 125-ton capacity electric arc furnace capable of producing approximately 800,000 tons of liquid steel per year.

Installation of a single 125-ton capacity electric arc furnace capable of producing approximately 800,000 tons of liquid steel per year.

Project Highlights

Cost: $30 million

Multidiscipline services
Replacement of two low-powered electric arc furnaces (EAFs) to a single 125-ton capacity EAF

Project Overview

R.E. Warner was chosen to provide multi-discipline engineering services for the construction of a complete Electric Arc Furnace Upgrade at a specialty product mini mill.

The project called for changing from their original operation of two low-powered electric arc furnaces (EAFs) to a single 125-ton capacity EAF capable of producing approximately 800,000 tons of liquid steel per year.

Our services included design, general arrangements, construction drawings and specifications for foundations, buildings, mechanical systems, power and utilities. In addition, we provided field support services during construction.
 

Market Director - Metals

William (Willie) Kesterson, PE

Contact
E-Mail
469-559-0480

Featured Services
Civil & Site Engineering
Electrical Engineering
Structural Engineering
Mechanical, HVAC & Piping Engineering
Architecture, Planning & Interior Design
Construction Services

See More

Get details about our capabilities or see more projects.

Our Services
Portfolio

Join our email newsletter

Back to top
Copyright 2025 R.E. Warner & Associates

Menu

AboutCareers
440-835-9400
440-835-9474
Ohio Office (HQ) 25000 Country Club Blvd., Ste. 340 North Olmsted, OH 44070
440-835-9400
440-835-9474
Alabama Office 1500 1st Avenue N Innovation Depot #99 Birmingham, AL 35203