ODRC Site Drainage and Sanitary Sewer Renovation at Grafton and Lorain Correctional Institution
Permalink

ODRC Site Drainage and Sanitary Sewer Renovation

ODRC Site Drainage and Sanitary Sewer Renovation

,

Study, evaluation and preparation of plans and specifications to construct stormwater drainage improvements, eliminate sanitary sewer infiltration and increase water pressure at the Grafton Correctional Institution and the Lorain Correctional Institution. The following pre-design, design development, construction documents, bidding and construction administration tasks were included:

Kick-off meeting with agency and […]

CMHA HVAC Improvements at Five High-rise Sites
Permalink

New Boiler Plant

New Boiler Plant

, ,

In order to reduce their dependence on steam from neighboring Goodyear Tire and Rubber Company, a specialty chemicals plant, through Williams Construction & Project Management, Inc., retained R.E. Warner to prepare preliminary and conceptual engineering for development of a new boiler plant.

The new facility will be fueled by natural gas […]

ArcelorMittal-IHW-Plant
Permalink

Indiana Harbor East/West Steam Line Preliminary Engineering

Indiana Harbor East/West Steam Line Preliminary Engineering

,

Preliminary and conceptual engineering to determine the economic feasibility of utilizing blast furnace gas from a steel producer’s east side blast furnaces at their west side boilers.

NEORSD-southerly
Permalink

Southerly WWTP Low Voltage Equipment Replacement

Southerly WWTP Low Voltage Equipment Replacement

,

As part of a consultant team, R.E. Warner provided electrical engineering services to perform a field survey and prepare plans and specifications to replace low voltage equipment at NEORSD’s Southerly Wastewater Treatment Plant. Our scope of work includes the following: