Utility Infrastructure

CMHA HVAC Improvements at Five High-rise Sites
Permalink

Various Water Main Replacements, Contract 1

Various Water Main Replacements, Contract 1

,

Preparation of water main designs, construction plans, bid documents and bidding assistance for various water main replacements on eight residential streets including pavement milling and resurfacing, new curb ramps,  and drainage structure improvements. The project included 4,900 feet of new 8” CL 52 DIP, 95 services connections, 13 new […]

Parma-Sanitary-Sewer
Permalink

Sanitary Sewers

Sanitary Sewers

,

Preparation of plans and specifications for construction of approximately 4,000 L.F. of new residential sanitary sewers and appurtenances located on Green Valley Drive, David Avenue, Orchardview Drive, Howard Street and Robert Drive in the City of Parma, Ohio. The new sanitary sewers are to replace the existing septic systems […]

Powerhouse-Utility-Interconnections
Permalink

Powerhouse Utility Interconnections

Powerhouse Utility Interconnections

, ,

R.E. Warner & Associates was selected to provide engineering and construction support services for major utility interconnections linking several blast furnaces and powerhouses at a steel producer’s Cleveland Works. The $15 million project was the capstone to a series of feasibility and preliminary engineering projects.

As a result, blast furnace […]

Power House Cold Idling Engineering
Permalink

Powerhouse Cold Idling Engineering

Powerhouse Cold Idling Engineering

, ,

R.E. Warner is the design consultant to Rudolph Libbe for “cold idle” of a powerhouse of a Cleveland automotive facility while maintaining the primary power and distribution active.

This project involves the utility decommissioning required to allow the powerhouse to be put in cold idle. The following are part of […]

CMHA HVAC Improvements at Five High-rise Sites
Permalink

Water Pipeline Project

Water Pipeline Project

,

The Ohio EPA mandated a titanium dioxide manufacturer to redirect pre-treated storm and wastewater discharged from two facilities, totaling up to 6,500 gpm, from a local stream to a flow augmentation canal on Lake Erie through a new three mile pipeline system. 

The new system consisted of two main pumping […]