Power

B&W-Temple-Inland_1
Permalink

Temple-Inland Orange Flue and Duct System

Temple-Inland Orange Flue and Duct System

,

PROJECT DESCRIPTION:

Preparation of design drawings for the installation of the Temple Inland orange flue and duct system to improve boiler efficiency by increasing the throughput. The system included connecting existing dust collector to new economizer, new economizer to induced draft fan inlet and new induced draft fan to existing […]

Bruce Mansfield Power Plant Fuel Oil System Upgrade
Permalink

Bruce Mansfield Power Plant Fuel Oil System Upgrade

Bruce Mansfield Power Plant Fuel Oil System Upgrade

,

PROJECT DESCRIPTION:

R.E. Warner was retained to design, analyze and prepare plans and specifications for construction of a new 8 inch, 3,000 lf above ground fuel oil line, including stress analysis, pipe supports and bridges at the Bruce Mansfield power plant.

R.E. Warner’s scope of work included:

Design of a fully operational […]

Yards Creek Generating Station Upper Reservoir Intake Emergency Shutoff
Permalink

Yards Creek Generating Station Upper Reservoir Intake Emergency Shutoff

Yards Creek Generating Station Upper Reservoir Intake Emergency Shutoff

,

As a consultant, R.E.Warner is providing electrical and controls design for the upper reservoir intake emergency shutoff at the Yards Creek generating station in Blairstown, New Jersey.   R.E. Warner is providing preliminary and detailed engineering and construction administration for electrical and control systems drawings and specifications including:

Slide gate control […]

Peco
Permalink

Precipitator Replacement

Precipitator Replacement

,

PROJECT DESCRIPTION:

PECO was selected to provide a new precipitator system for Cinergy that required major structural modifications for installation. R.E. Warner & Associates, Inc. provided structural engineering, design and drawings for procurement of the steel fabricators by PECO. The goal was to complete the engineering and procurement by November, […]