Temple-Inland Orange Flue and Duct System
Temple-Inland Orange Flue and Duct System
Environmental Services, Power
PROJECT DESCRIPTION:
Preparation of design drawings for the installation of the Temple Inland orange flue and duct system to improve boiler efficiency by increasing the throughput. The system included connecting existing dust collector to new economizer, new economizer to induced draft fan inlet and new induced draft fan to existing […]

Armstrong Power Plant Decommissioning
Armstrong Power Plant Decommissioning
Buildings & Facilities, Energy, Environmental Services, Featured, Power
R.E. Warner, in association with an environmental engineering firm, has been selected to undertake an assessment of the recently retired Armstrong Power Plant in Kittanning, Pennsylvania. To maximize asset recovery from the plant, our team is providing an assessment of environmental remediation options based on future reuse, and assistance […]

Bruce Mansfield Power Plant Fuel Oil System Upgrade
Bruce Mansfield Power Plant Fuel Oil System Upgrade
Power, Utility Infrastructure
PROJECT DESCRIPTION:
R.E. Warner was retained to design, analyze and prepare plans and specifications for construction of a new 8 inch, 3,000 lf above ground fuel oil line, including stress analysis, pipe supports and bridges at the Bruce Mansfield power plant.
R.E. Warner’s scope of work included:
Design of a fully operational […]

Yards Creek Generating Station Upper Reservoir Intake Emergency Shutoff
Yards Creek Generating Station Upper Reservoir Intake Emergency Shutoff
Energy, Power
As a consultant, R.E.Warner is providing electrical and controls design for the upper reservoir intake emergency shutoff at the Yards Creek generating station in Blairstown, New Jersey. R.E. Warner is providing preliminary and detailed engineering and construction administration for electrical and control systems drawings and specifications including:
Slide gate control […]

Precipitator Replacement
Precipitator Replacement
Environmental Services, Power
PROJECT DESCRIPTION:
PECO was selected to provide a new precipitator system for Cinergy that required major structural modifications for installation. R.E. Warner & Associates, Inc. provided structural engineering, design and drawings for procurement of the steel fabricators by PECO. The goal was to complete the engineering and procurement by November, […]