PROJECT DESCRIPTION:

R.E. Warner & Associates, Inc. has been awarded four consecutive indefinite delivery contracts to provide architectural and engineering services on an as needed basis to assist the CMHA Construction Department with the disposition of projects which require an emergency, short or long term completion.  We have successfully managed and completed more than 50 task orders (projects) under these contracts.  Task orders included:

  • Field observation and written recommendation to remediate the electrical hazards at the Phoenix Village Housing complex.
  • Structural analysis and recommendations for repair to the reinforced concrete balconies at Cedar Extension high rise complex
  • West 101 boiler and HVAC systems upgrade
  • Post energy audit for competitive grants at Addison, Beachcrest, Bellaire, Bohn Tower, King Kennedy, West Riverview Gardens, Willson Tower and Woodhill Estates
  • Study, design and construction administration to replace and relocate existing natural gas generator at CMHA’s Addison high rise facility
  • Beachcrest generator replacement
  • Police headquarter panel replacement
  • IT UPS at CMHA campus
  • Wade Apartments boiler and domestic hot water improvements
  • Bohn Tower parking garage fire suppression system investigation
  • Procurement documents for replacement of existing circuit breaker panels at several existing family development sites and multiple scattered site properties
  •  Development of a preliminary physical needs assessment for a series of select properties within the CMHA housing stock including plumbing, mechanical, and electrical systems
  •  Construction documents and construction administration for improvements at Miles Elmarge facilities
  • Study and analysis of chilled water system at Riverview Towers
  • Study, construction documents and construction administration for replacement of a natural gas generator and transfer switch at CMHA’s Bellaire Gardens
  • King Kennedy North West Wing plumbing improvements
  • Woodhill heating upgrade
  • Wade Park boiler replacement
  • Spring Brook boiler replacement
  • King Kennedy day care center rooftop multi-zone unit replacement
  • Building system energy efficiency analysis and report of select systems throughout all buildings owned and managed by CMHA as well as project management and construction administration services to support the design
  • Woodhill Estates renovations.
  • Outhwaite Homes electrical upgrades.
  • Olde Cedar storage building addition.
  • Study, design and construction administration to replace and relocate existing natural gas generator at Addison high rise facility.
  • Quarrytown fire alarm system improvements.
  • Ambleside Apartments fire alarm system improvements.
  • Kinsman Avenue traffic study.
  • Severance Tower highrise boiler replacement.
  • King Kennedy north fire alarm system improvements.
  • Willson Highrise first floor kitchen improvements.
  • Woodhill Estates gas line installation and tenant electric cooking conversion.
  • HVAC system study and design for improvements to the 12-story high-rise at Riverview Towers.
  • Design of replacement emergency generators at two high-rise properties.
  • Design of ground floor plumbing improvements at King Kennedy high-rise.
  • Energy usage study at Woodhill Estates to determine most economic energy source for the development.
  • Laround Housing facility parking garage structural evaluation.
  • Lakeview Terrace Community Center plumbing investigation.
  • West Boulevard fire alarm system upgrades.
  • Fairway Manor boiler and domestic hot water improvements.
  • Lorain Square and Willson Highrise emergency generator replacements.
  • Union Square emergency generator replacement.
  • Lakeview sewer venting improvements.
  • Severance Tower highrise generator replacement.
  • Riverview Towers security desk and mail room improvements.