The project work length is approximately 800 feet.  The project included surveying the project area to supplement data already collected by the Lake County Engineer, improving the horizontal and vertical alignments, performing bridge hydraulic analysis and designing the bridge replacement structure.  The existing pony truss structure was replaced with a single span pre-cast pre-stressed box beam bridge.  Project also included roadway plans, maintenance of traffic, environmental documents and right-of-way plans.