R.E. Warner was selected for engineering, design and preparation of plans to modify an existing control room, operator station and break room to withstand blast pressures from postulated explosion scenarios developed during the Facility Siting process.

  • API 752 Facility Siting upgrade of occupied buildings
  • Strengthen control room, operator station and break room to withstand postulated blast pressures
  • Utilized a combination of Fiberglass Reinforced Polymer (FRP) and structural reinforcement to harden structures
  • Modified HVAC system to pressurize the space and provide safe haven