PROJECT DESCRIPTION:

R.E.Warner was selected by a manufacturer of welded and seamless tube products to provide engineering and detailed design for expansion of two tubular production buildings that includes construction of a new pickle line, relocation of an existing finishing line, installation of a new 10-ton/hr stress relief furnace, and installation of a new finishing line.

PROJECT HIGHLIGHTS:

  • This project adds 30,000 tons/year capacity
  • Design and construction is coordinated to maintain current operations consisting of 5 to 7 days per week depending on product and 2 or 3 shifts per day
  • Design is being performed on a very fast-track schedule with bid documents ready 8 weeks after award