PROJECT DESCRIPTION:
R.E.Warner was selected to provide detailed engineering for the installation of process, piping, mechanical and electrical systems for a new production building at an automotive coatings manufacturing plant. R.E.Warner completed preliminary and conceptual engineering and detailed civil/structural engineering for the project under a previous contract.
PROJECT HIGHLIGHTS:
- Increased production 3.5 mm gals/year
- Large batch blending operations
- Bulk raw material delivery piping design
- New electrical substation and utility feed