Construction Administration, Inspection, and Field Testing Services for the widening and resurfacing of 2.66 miles of CR 59 (Cowley Road) from Crocker Road (TR 8) to SR 82 (Royalton Road) in Eaton Township. Cowley Road is classified as a minor two lane urban collector with narrow asphalt pavement, substandard shoulders, more than 100 drives, roadside ditches and culvert drainage systems. The 45 mph facility is a parallel north-south roadway connecting SR 82 on the north with Crocker Road on the south. The project length is approximately 14,000 feet. The proposed improvements include minor pavement widening, improved paved and graded shoulder widening, pavement repairs and resurfacing, upgraded drainage systems and safety improvements.