PROJECT DESCRIPTION

R.E. Warner led the design efforts for construction of the new 4,600 square foot, Aurora Road Pump Station.  The project includes preliminary design, existing conditions survey, detailed design, construction bidding and award support, construction administration support, and resident engineering services.  The design work includes a pump station building with landscaping, driveways and security, installation of horizontal pumps with associated piping and all related structural, mechanical and electrical appurtenances.  This new 15 MGD booster pump station will house five split-case centrifugal pumps, suction piping, discharge piping, electrical distribution equipment and controls to operate the remote pump station and provide system redundancy to the Cleveland Water Department, Broadway Service District.